Phase 1: Requirement Gathering

  • Project Description (Done)
  • Studying Business & Observation (Done)
  • System Requirements Specification (Done)

Phase 2: Analysis and Design

  • Analysis and Design (In Progress - Deadline: 21 March 2015)
  • Prototype
  • Test Scripts

Phase 3: Implementation

  • Create Database Script
  • Design Template and Create UI
  • Create Services for Model and Control Levels
  • Integrate UI and Control Levels

Phase 4: Testing & Depolyment

  • Unit Test
  • Integration Test
  • System Test
  • Pilot Test (Alpha Test)
  • Beta Test

Phase 5: Documentation

  • User Guide
  • Developer Guide
  • Installation Guide

Phase 6: Future Enhancement

  • Web Installer
  • Develop Mobile App
  • Provide additional and advanced features

Last edited Jan 28, 2015 at 2:10 PM by mahyar1984, version 6